Finished the last filler work on the main shell of the car today. It is all smooth now and ready for some clean up and epoxy primer (about time).
Saturday, August 30, 2014
Wednesday, August 27, 2014
Wow this is taking a while.
We did some more stripping and grinding today. Another day of filling tomorrow.
Sunday, August 17, 2014
Back to it.
After a hiatus for my trip to SoCal, back to work today. We got the filler sanded on the rear valance. We then got the rear quarter panel windows removed (what a nightmare they are going to be to put back in), and removed the rear scoops. We then finished wire brushing the roof on the inside and got a coat of rust encapsulator on it. More filler will go on tonight.
Wednesday, July 30, 2014
Welded rear valance.
I welded on the rear valance today and trimmed down the rear bumper brackets. I will have to weld them in tomorrow when it stops raining.
Tuesday, July 29, 2014
More sanding and grinding.
A little more sanding today. Passenger door jamb is completely stripped. Ashley got about half of the roof to metal.
Monday, July 28, 2014
Little more sanding.
We got a little more stripping and sanding done this afternoon. Also, here is the damage on the driver's side door.
Wednesday, July 23, 2014
Passenger quarter filler started.
I got started on filling the passenger side quarter this afternoon. I will probably have to put Ashley on block sanding duty, as my carpal has been killing me lately. I also went and got some blasting sand and did some blasting on the driver side door jamb. It makes quick work of the tough to sand areas, but what a mess. I will need to rig something up with my shop vac to collect it (and reuse it).
Subscribe to:
Posts (Atom)