It was warm out this afternoon so we worked on the Mustang some. Ashley got the spindles cleaned and painted with the KBS Rustseal and then got a small sheet metal patch for the torque box side panel made. I meanwhile got a patch made for the driver's side shock tower and got the rust cut away and everything prepared for welding. My hands then gave up on me so I will have to finish this weekend.
No comments:
Post a Comment